Barrio EnergyGrid
Texas transmission lines, substations and planned upgrades on the Barrio Grid map
Texas power siting intelligence

Every substation in Texas. One map. One API.

Find power before you find land. Barrio Grid maps the whole Texas grid, from 765 kV backbone to the parcel next to the substation, and answers siting questions in milliseconds on the web, in code, or inside your AI assistant.

Free key: 100 calls a day, no card. Pro: $249 a month, cancel any time.

4,939substations with voltage and owner
7,033transmission lines, colored by kV
1,874ERCOT queue projects
664planned lines and new substations
213,000parcels with acreage, 9 counties
Statewide view of Texas substations and transmission
The whole grid

See Texas the way the utilities do

Every high-voltage substation and line in the state on one dark, fast map. Lines are colored by voltage so the 345 kV and 765 kV backbone stands out at a glance. Planned ERCOT and PUCT projects sit on top, with docket numbers and expected dates.

Substations138 kV345 kVPlannedQueue
Parcel outlines near Edna, Texas with the grid context panel
Down to the parcel

Click anywhere. Get the grid around it.

Zoom in and parcel lines appear with acreage. Tap any spot and Barrio Grid returns the likely utility, the nearest substations with voltage, owner and distance, every line within 5 miles, queue projects nearby, and planned upgrades within 25 miles.

  • Search by address, city or county
  • Screen powered land: acres, distance to a 138 kV or 345 kV substation
  • Satellite view for a quick look at the ground
ERCOT queue projects and planned transmission on the Gulf Coast
What is coming

Read the queue before you sign the lease

Solar, wind, storage and gas projects in the ERCOT interconnection queue, with MW and study status, sit next to the transmission that is being built. See where generation is crowding a node and where new 345 kV and 765 kV capacity is headed.

  • 1,874 queue projects by fuel and MW
  • 664 approved, proposed and under-construction grid projects
  • Substation owners enriched and checked against OpenStreetMap
Find 50+ acre parcels within a mile of a 138 kV substation in Jackson County.
barrio-grid · find_powered_land
Three parcels qualify. The closest:
AcresSubstationkVmi
138.8ETP Substation1380.17
60.5Ganade1380.27
133.9Ganade1380.35
Who serves the first one, and what grid work is planned nearby?
barrio-grid · grid_context
Likely STEC. Within 25 miles: the approved Hillje 765 kV substation on the STEP Eastern Backbone, Hillje 345 kV upgrades, and the Old Hickory 345 kV switchyard, energized in 2025.
AI native

Ask your assistant. It asks the grid.

Barrio Grid is a Model Context Protocol server. Add one URL to Claude, ChatGPT or Muse and your assistant can answer siting questions with live grid data instead of guesses. Developers get the same six tools as a REST API.

Built for the people who site power

Developers

Screen dozens of sites in an afternoon, not a month of utility calls.

Brokers

Lead with power. Show a buyer the substation, the line and the acreage together.

Storage and generation

Check queue crowding and planned upgrades before you file.

Funds and lenders

Pressure-test a site's grid story in minutes during diligence.

Start with a free key. Upgrade when you need the map.

Free: 100 calls a day. Pro: 5,000 calls a month, 200-parcel searches and the full map for $249 a month.

Sources: HIFLD, ERCOT GIS reports, TNRIS StratMap, PUCT and ERCOT RPG filings, Barrio research. Screening data; confirm capacity with the utility.