What Pro unlocks
Free shows you where things are. Pro tells you what they are, how big, who owns them and when they land, on the map and inside your AI assistant.
Then $499 a month. Pause or cancel any time.
In your AI assistant
Same question, two answers. These are real responses from the Barrio Grid connector.
Three battery projects are in the ERCOT queue in Jackson County, all in the South zone. Two have signed interconnection agreements and one is in full study. Their locations are near Ganado, Lolita and Edna.
Names, MW, developers, interconnection substations and dates are on Pro.
Three projects, 426 MW total, 304 MW with signed interconnection agreements:
- Dios BESS, 201 MW, IA signed, Ganado 138 kV, COD Dec 2027
- Third Coast BESS, 103 MW, IA signed, Lolita 138 kV, COD Dec 2028
- Sayle Storage, 122 MW, full study under way, 69 kV tap Edna to El Toro, COD May 2028
Plus developer names, study dates and a map link that opens the spot already signed in.
Score 72/100 for a data center.
The 13 flags behind the score (substation, lines, queue, planned upgrades, gas, jurisdiction, prices, neighbors) are on Pro.
Score 72/100 for a data center, with the method shown. Flags include:
- Nearest substation Edna, 138 kV, AEP Texas, 2.3 mi; 138 kV is workable for tens of MW
- 10 planned grid projects within 25 miles
- 426 MW of batteries and 271 MW of generation queued nearby
- Gas line 0.37 mi away, 36 inch line nearby, interstate at 1.05 mi
- Likely in Edna's ETJ, Texana groundwater district, Edna ISD
- LZ_SOUTH 30-day day-ahead average and nearest node battery spread
Company search is Pro. Free accounts can list every data center location near a site or in a county, with status and type.
23 companies have 3 or more data center projects in Texas. Pro names them and shows every site.
Nine projects across seven counties, 6,325 MW stated:
- Abilene Stargate (OpenAI/Oracle), 1.2 GW, partly operating
- Childress with Lancium, 1 GW, tax abatement approved
- Port of Victoria AI campus, 1 GW, announced; plus Blue Energy nuclear offtake, 1.5 GW
- Abilene Microsoft AI factory, 900 MW, land acquired
- Goodnight, Armstrong County, 525 MW, in permitting
- Woodrow (Nolan), Longhorn (Taylor), Wilbarger County
Pro tools and limits for assistants
- 5,000 calls a month (free: 20 a day, 100 a month)
- Prices: 120 days of day-ahead and real-time history, 50 ranked nodes (free: 7 days, 10 nodes)
- Full queue detail: generation and battery project names, MW, developers, POI substations, study stage and COD
- Planned grid: new substations, lines and upgrades with kV, owner, cost, docket and in-service dates through the tools and site cards; the New substations and Substation upgrades map layers are on Enterprise
- Air permits with company, project, fuel, MW and filing dates, including data center permits
- Data centers: 364 Texas projects with companies, status, MW, capex, utility, abatements and sources; company footprints for the 38 companies with 3+ sites
- Local sentiment: how 84 counties and 73 cities treat data centers, scored from abatements, zoning votes, moratoria, denials and lawsuits, with sources
- News summaries on every data center story, linked to its projects
- Prices: 120 days of nodal history, real-time averages, whats_new filings in your counties
On the map
Data center footprints
364 Texas data center projects on 274 campuses: operating, under construction, in permitting and announced. Search any company, or filter to the 38 with three or more Texas projects, and the map shows only their sites. Free shows every location.
Local sentiment
Which counties and cities want data centers. County fill and city outline are colored by a score built from every recorded action since September 2024: abatements, zoning approvals and development agreements count for, moratoria, restrictive ordinances, denials, withdrawals after opposition and lawsuits count against. Click any county or city for its recent votes and the sources behind them.
Data center news on the map
Local and trade stories pinned to the project, town or county. Free shows the headline and link; Pro adds a short summary of each story and the projects it covers.
Every project, sourced
Developer and end user, MW, acres, capex, expected online date, utility and substation, tax abatements, local opposition, and links to the filings and news behind it.
Battery and generation queue
Every storage and generation project in the ERCOT queue, sized by MW. Click for developer, interconnection substation, study stage, IA date and projected COD. Free shows the dots and stages only.
What the grid is building
New substations, approved lines and substation upgrades, with voltage, owners, cost, ERCOT and PUCT dockets, expected in-service dates and why each one is being built. On Pro this comes through the tools, site cards and the approved lines layer; the new substation and upgrade map layers are on Enterprise.
Parcels
Appraisal district parcel shapes with property ID, acres, legal description and values. Landowner names, mailing addresses and the owner's other land nearby are on Enterprise Lite ($999 a month total, see pricing) and Enterprise.
Every pricing node
Open any ERCOT node or hub: hourly day-ahead prices, peak and off-peak, spikes, negative hours, real-time average and a daily table. Free gets one node panel a day.
Check any spot
Click anywhere in Texas: nearest substations by voltage and owner, lines within 5 miles, queue projects nearby and planned grid work within 25 miles. Free shows the likely utility and three substations, 10 clicks a day.
Air permits
TCEQ permits for generation and data centers, pending first. They show gas turbines and data center power before a project reaches the ERCOT queue or the news.
Upgrade from anywhere
On the web: the buttons on this page. In an assistant: ask "how do I upgrade Barrio Grid?" and it returns a checkout link tied to your account. Pay with Link or a card and that connection is Pro right away.
