San Patricio County, Texas: power grid and siting data

San Patricio County is in ERCOT's SOUTH load zone. It has 43 mapped substations, owned mostly by AEP Texas, STEC and Nrg Energy; the highest voltage is 345 kV. The ERCOT queue lists 13 generation projects (9 solar, 2 gas and 2 wind) and 14 battery storage projects here.

43substations
345 kVhighest voltage
13generation projects queued
14battery projects queued
$48.57SOUTH zone, 7-day avg $/MWh
Map of substations in San Patricio County, Texas

Substations in San Patricio County

7 at 345 kV, 27 at 138 kV, 9 at 69 kV and below. The 30 highest-voltage stations are listed; the map shows all 43.

SubstationVoltageOwnerLines
El Algodon Alto Wind Farm345 kVAEP Texasmap
Angstrom345 kVAEP Texasmap
El Algodon Alto Wind Poi345 kVAEP Texasmap
Lucero345 kVAEP Texasmap
Naismith345 kVAEP Texasmap
Steel Dynamics Incorporated (Sdi)345 kVAEP Texasmap
Welder Poi345 kVAEP Texasmap
Whitepoint138 kVAEP Texas9map
Rincon138 kVAEP Texas7map
Dupont Switching Station138 kVAEP Texas7map
Odem138 kVAEP Texas2map
Gregory Switchyard138 kVNrg Energy2map
Mayo138 kVAEP Texas2map
Ingleside138 kVAEP Texas2map
Sinton138 kVAEP Texas2map
Taft138 kVAEP Texas2map
Aransas Pass138 kVAEP Texas2map
Portland138 kVAEP Texas1map
Papalote Creek Wind Farm138 kVE On1map
Gregory138 kVAEP Texas0map
Dupont Pp1138 kVChemours0map
Ingleside Cogeneration Switchyard138 kVChemours Occidental Petroleum0map
Gulf Coast Growth Venture 138kv 4138 kVAEP Texasmap
Haisley138 kVAEP Texasmap
Hecker138 kVAEP Texasmap
Homeport (Ins Ingleside)138 kVAEP Texasmap
Hot Iron138 kVAEP Texasmap
Jackalope Solar138 kVAEP Texasmap
Jackalope Solar Poi138 kVAEP Texasmap
Mccampbell138 kVAEP Texasmap

ERCOT interconnection queue

13 generation projects are queued in San Patricio County: 9 solar, 2 gas and 2 wind. By stage: 8 with a signed interconnection agreement and 5 in full interconnection study. 14 battery storage projects are queued, 4 with a signed interconnection agreement.

From the ERCOT GIS report. Project names, developers, MW and dates are on Pro.

Planned transmission

9 planned grid projects touch San Patricio County: 2 new substations, 5 new or rebuilt lines and 2 substation upgrades, 2 at 345 kV or above; 1 already energized.

Wholesale power prices

The SOUTH load zone averaged $48.57/MWh day-ahead over the last 7 days. Nearest generator pricing nodes: PIN_BESS_RN $45.45, CARN_ESS_RN $45.92 and ALGOD_ALL_RN $44.33.

ERCOT day-ahead settlement point prices. Hourly history, battery spreads and real-time prices are on the map.

Jurisdiction

Nearest city to the county center: Sinton (1 mi). Outside city limits and ETJ, development falls under county rules and state law. City limits and estimated ETJ are on the map.

Nearby counties

See San Patricio County on the map

Every substation, line, queue project, pipeline and price node in Texas, plus Dub, an AI landman who answers questions about any spot. Free account, no card.

Sources: HIFLD and OpenStreetMap substations and lines, ERCOT GIS report (queue, 2026-09), ERCOT day-ahead prices, TxDOT and StratMap boundaries, Barrio Energy research. Updated 2026-11-09. Screening data only; the serving utility confirms capacity.