Barrio EnergyGrid
Barrio Grid / Texas counties / Dickens County

Dickens County, Texas: power grid and siting data

Dickens County is in ERCOT's WEST load zone. It has 5 mapped substations, owned mostly by AEP Texas, Wind Energy Transmission Texas and Rockin 4C Ranches Llc; the highest voltage is 345 kV. The ERCOT queue lists 6 generation projects (5 solar and 1 wind) and 3 battery storage projects here.

5substations
345 kVhighest voltage
6generation projects queued
3battery projects queued
$57.31WEST zone, 7-day avg $/MWh
Map of substations in Dickens County, Texas

Substations in Dickens County

2 at 345 kV, 1 at 138 kV, 2 at 69 kV and below.

SubstationVoltageOwnerLines
Cottonwood345 kVWind Energy Transmission Texas6map
Hyperion345 kVAEP Texasmap
Spur138 kVAEP Texas4map
Unnamed station69 kVRockin 4C Ranches Llc1map
Matador69 kVAEP Texasmap

ERCOT interconnection queue

6 generation projects are queued in Dickens County: 5 solar and 1 wind. By stage: 5 with a signed interconnection agreement and 1 in full interconnection study. 3 battery storage projects are queued, 2 with a signed interconnection agreement.

From the ERCOT GIS report. Project names, developers, MW and dates are on Pro.

Planned transmission

No planned substations, lines or upgrades are recorded in Dickens County.

Wholesale power prices

The WEST load zone averaged $57.31/MWh day-ahead over the last 7 days. Nearest generator pricing nodes: COTTON_PAP2 $45.95, BKSL_RN $32.77 and DKNS_ESS_RN $32.77.

ERCOT day-ahead settlement point prices. Hourly history, battery spreads and real-time prices are on the map.

Data centers and large loads

1 announced data center campus in Dickens County, 1 at or above ERCOT's 75 MW large load threshold.

Jurisdiction

Nearest city to the county center: Dickens (2.7 mi). Outside city limits and ETJ, development falls under county rules and state law. City limits and estimated ETJ are on the map.

Nearby counties

See Dickens County on the map

Every substation, line, queue project, pipeline and price node in Texas, plus Dub, an AI landman who answers questions about any spot. Free account, no card.

Sources: HIFLD and OpenStreetMap substations and lines, ERCOT GIS report (queue, 2026-09), ERCOT day-ahead prices, TxDOT and StratMap boundaries, Barrio Energy research. Updated 2026-11-09. Screening data only; the serving utility confirms capacity.