Lampasas County, Texas: power grid and siting data

Lampasas County is in ERCOT's LCRA load zone. It has 6 mapped substations, owned mostly by LCRA, Brazos and Gebert Tonja L Etvir Arron; the highest voltage is 345 kV. The ERCOT queue lists 5 generation projects (5 solar) and 6 battery storage projects here.

6substations
345 kVhighest voltage
5generation projects queued
6battery projects queued
$44.89LCRA zone, 7-day avg $/MWh
Map of substations in Lampasas County, Texas

Substations in Lampasas County

1 at 345 kV, 4 at 138 kV, 1 at 69 kV and below.

SubstationVoltageOwnerLines
Kempner345 kVBrazos1map
Lampasas138 kVLCRA3map
Tap310584138 kVGebert Tonja L Etvir Arron3map
Evant138 kVLCRA2map
Adamsville138 kVLCRA2map
Lometa69 kVLCRA2map

ERCOT interconnection queue

5 generation projects are queued in Lampasas County: 5 solar. By stage: 1 with a signed interconnection agreement and 4 in full interconnection study. 6 battery storage projects are queued, 1 with a signed interconnection agreement.

From the ERCOT GIS report. Project names, developers, MW and dates are on Pro.

Planned transmission

3 planned grid projects touch Lampasas County: 1 new substation and 2 new or rebuilt lines.

Wholesale power prices

The LCRA load zone averaged $44.89/MWh day-ahead over the last 7 days. Nearest generator pricing nodes: GWEC_G1 $42.32, INKS_INKS_G1 $43.41 and HAMI_BESS_RN $74.94.

ERCOT day-ahead settlement point prices. Hourly history, battery spreads and real-time prices are on the map.

Jurisdiction

Nearest city to the county center: Lampasas (6.1 mi). Outside city limits and ETJ, development falls under county rules and state law. City limits and estimated ETJ are on the map.

Nearby counties

See Lampasas County on the map

Every substation, line, queue project, pipeline and price node in Texas, plus Dub, an AI landman who answers questions about any spot. Free account, no card.

Sources: HIFLD and OpenStreetMap substations and lines, ERCOT GIS report (queue, 2026-09), ERCOT day-ahead prices, TxDOT and StratMap boundaries, Barrio Energy research. Updated 2026-11-09. Screening data only; the serving utility confirms capacity.