Frio County is in ERCOT's SOUTH load zone. It has 13 mapped substations, owned mostly by STEC and AEP Texas; the highest voltage is 345 kV. The ERCOT queue lists 2 generation projects (2 solar) and 3 battery storage projects here.

13substations
345 kVhighest voltage
2generation projects queued
3battery projects queued
$48.57SOUTH zone, 7-day avg $/MWh
Map of substations in Frio County, Texas

Substations in Frio County

1 at 345 kV, 12 at 138 kV.

SubstationVoltageOwnerLines
Pearsall345 kVAEP Texas2map
Pearsall Power Plant138 kVSTEC11map
Dilley Switching138 kVAEP Texas7map
Moore138 kVSTEC4map
Derby138 kVSTEC4map
Big Foot138 kVAEP Texas4map
Dilley138 kVAEP Texas3map
Palo Duro138 kVSTEC3map
Frio Town138 kVSTEC2map
Moore138 kVSTEC2map
Dilley138 kVSTEC2map
Big Foot138 kVSTEC2map
Unnamed station138 kVSTEC1map

ERCOT interconnection queue

2 generation projects are queued in Frio County: 2 solar. By stage: 2 in full interconnection study. 3 battery storage projects are queued, 0 with a signed interconnection agreement.

From the ERCOT GIS report. Project names, developers, MW and dates are on Pro.

Planned transmission

1 planned grid project touches Frio County: 1 new or rebuilt line.

Wholesale power prices

The SOUTH load zone averaged $48.57/MWh day-ahead over the last 7 days. Nearest generator pricing nodes: PEARSALL_RN $45.48, PEARSA_1_24 $45.48 and ERSL_RN $45.42.

ERCOT day-ahead settlement point prices. Hourly history, battery spreads and real-time prices are on the map.

Data centers and large loads

1 announced data center campus in Frio County, 1 at or above ERCOT's 75 MW large load threshold.

Jurisdiction

Nearest city to the county center: Pearsall (0 mi). Outside city limits and ETJ, development falls under county rules and state law. City limits and estimated ETJ are on the map.

Nearby counties

See Frio County on the map

Every substation, line, queue project, pipeline and price node in Texas, plus Dub, an AI landman who answers questions about any spot. Free account, no card.

Sources: HIFLD and OpenStreetMap substations and lines, ERCOT GIS report (queue, 2026-09), ERCOT day-ahead prices, TxDOT and StratMap boundaries, Barrio Energy research. Updated 2026-11-09. Screening data only; the serving utility confirms capacity.