Ector County, Texas: power grid and siting data

Ector County is in ERCOT's WEST load zone. It has 36 mapped substations, owned mostly by Oncor, La Frontera Holdings Llc and Gcc Permian Llc; the highest voltage is 345 kV. The ERCOT queue lists 11 generation projects (11 solar) and 10 battery storage projects here.

36substations
345 kVhighest voltage
11generation projects queued
10battery projects queued
$57.31WEST zone, 7-day avg $/MWh
Map of substations in Ector County, Texas

Substations in Ector County

8 at 345 kV, 24 at 138 kV, 4 at 69 kV and below. The 30 highest-voltage stations are listed; the map shows all 36.

SubstationVoltageOwnerLines
Odessa345 kVOncor12map
Moss Switchyard345 kVOncor10map
Odessa 345345 kVOncor5map
Unnamed station345 kVLa Frontera Holdings Llc4map
Quail345 kVOncor4map
Goldsmith345 kVOncor2map
Odessa Basin345 kVOncor2map
Oxy North Cowden345 kVOncor1map
Odessa138 kVOncor4map
Holt Switching Station138 kVOncor4map
Tap310839138 kVGcc Permian Llc4map
Tap302627138 kVOncor3map
Tap302715138 kVWood Ec & T Brand Llc3map
Tap307917138 kVOncor3map
Tap308113138 kVOncor3map
Tap310568138 kVNorth Sisters Ranch Ltd3map
Tap310685138 kVOncor3map
Unnamed station138 kVOncor2map
Odessa North138 kVOncor2map
Judkins138 kVOncor2map
Westover138 kVOncor2map
Odessa Southwest138 kVOncor2map
Ector Hillmont138 kVOncor2map
Glenhaven138 kVOncor2map
Liquid Air138 kVOncor1map
Westover138 kVOncor1map
Southwestern Portland 138 kVOncor1map
Olefin138 kVOncor1map
Ector North138 kVOncor1map
Ector Harper138 kVOncor1map

ERCOT interconnection queue

11 generation projects are queued in Ector County: 11 solar. By stage: 2 with a signed interconnection agreement, 7 in full interconnection study and 2 done with the full study. 10 battery storage projects are queued, 2 with a signed interconnection agreement.

From the ERCOT GIS report. Project names, developers, MW and dates are on Pro.

Planned transmission

4 planned grid projects touch Ector County: 1 new substation and 3 new or rebuilt lines, 4 at 345 kV or above.

Wholesale power prices

The WEST load zone averaged $57.31/MWh day-ahead over the last 7 days. Nearest generator pricing nodes: JDKNS_RN $61.00, OBERON_U1 $61.07 and APPLE_ESR_RN $61.15.

ERCOT day-ahead settlement point prices. Hourly history, battery spreads and real-time prices are on the map.

Data centers and large loads

Jurisdiction

Nearest city to the county center: Odessa (6.4 mi). Outside city limits and ETJ, development falls under county rules and state law. City limits and estimated ETJ are on the map.

Nearby counties

See Ector County on the map

Every substation, line, queue project, pipeline and price node in Texas, plus Dub, an AI landman who answers questions about any spot. Free account, no card.

Sources: HIFLD and OpenStreetMap substations and lines, ERCOT GIS report (queue, 2026-09), ERCOT day-ahead prices, TxDOT and StratMap boundaries, Barrio Energy research. Updated 2026-11-09. Screening data only; the serving utility confirms capacity.