Midland County, Texas: power grid and siting data

Midland County is in ERCOT's WEST load zone. It has 31 mapped substations, owned mostly by Oncor, Sharyland and Colorado River Municipal Water District; the highest voltage is 345 kV. The ERCOT queue lists 4 generation projects (2 gas and 2 solar) and 3 battery storage projects here.

31substations
345 kVhighest voltage
4generation projects queued
3battery projects queued
$57.31WEST zone, 7-day avg $/MWh
Map of substations in Midland County, Texas

Substations in Midland County

3 at 345 kV, 1 at 230 kV, 24 at 138 kV, 3 at 69 kV and below. The 30 highest-voltage stations are listed; the map shows all 31.

SubstationVoltageOwnerLines
Midland East345 kVOncor5map
Midland East345 kVOncor3map
Midland West345 kVOncor2map
Gardendale230 kVSharyland4map
Midland County Northwest138 kVOncor8map
Spraberry138 kVOncor4map
Tap310786138 kVPioneer Natural Resources Usa Inc4map
Tap305118138 kVOncor3map
Tap305267138 kVOncor3map
Midessa138 kVOncor3map
Tap308071138 kVDjk Inc3map
Adobe Meadows138 kVOncor2map
Greenwood138 kVSharyland2map
East Midland138 kVSharyland2map
Midland Downtown138 kVOncor2map
Windwood138 kVOncor2map
South Midland138 kVSharyland2map
Colorado River Municipal Water District #8138 kVColorado River Municipal Water District1map
Pegasus138 kVOncor1map
Colorado River Municipal Water District #8138 kVColorado River Municipal Water District1map
Peck138 kVOncor1map
Unnamed station138 kVOncor1map
Midland Airport138 kVOncor1map
Pegasus South138 kVOncor1map
Goddard138 kVOncor0map
Driver138 kVSharyland0map
Midland Gulf138 kVOncor0map
Mockingbird138 kVOncor0map
Spraberry69 kVOncor3map
Salt Flat Road69 kVSharyland2map

ERCOT interconnection queue

4 generation projects are queued in Midland County: 2 gas and 2 solar. By stage: 1 with a signed interconnection agreement and 3 in full interconnection study. 3 battery storage projects are queued, 1 with a signed interconnection agreement.

From the ERCOT GIS report. Project names, developers, MW and dates are on Pro.

Planned transmission

10 planned grid projects touch Midland County: 2 new substations and 8 new or rebuilt lines, 9 at 345 kV or above.

Wholesale power prices

The WEST load zone averaged $57.31/MWh day-ahead over the last 7 days. Nearest generator pricing nodes: KARAKAW1_1 $44.61, PIONR_DJ_RN $61.22 and GRDNE_ESR_RN $61.49.

ERCOT day-ahead settlement point prices. Hourly history, battery spreads and real-time prices are on the map.

Data centers and large loads

2 announced data center campuses in Midland County, 2 at or above ERCOT's 75 MW large load threshold.

Jurisdiction

Nearest city to the county center: Midland (7.1 mi). Outside city limits and ETJ, development falls under county rules and state law. City limits and estimated ETJ are on the map.

Nearby counties

See Midland County on the map

Every substation, line, queue project, pipeline and price node in Texas, plus Dub, an AI landman who answers questions about any spot. Free account, no card.

Sources: HIFLD and OpenStreetMap substations and lines, ERCOT GIS report (queue, 2026-09), ERCOT day-ahead prices, TxDOT and StratMap boundaries, Barrio Energy research. Updated 2026-11-09. Screening data only; the serving utility confirms capacity.