Barrio EnergyGrid
Barrio Grid / Texas / Dallas County / Watermill Substation

Watermill Substation, Dallas County, Texas

Watermill Substation is a 345 kV station in Dallas County, Texas, owned by Texas Utilities Elec Co with 13 transmission lines connected. It is classed as a transmission station: load service would need a new transformer or a distribution sub fed from it. 1 queued project names it as its point of interconnection.

345 kVhighest voltage
13lines
1generation projects at this POI
0battery projects at this POI
NORTHERCOT load zone
Map of Watermill Substation and nearby substations

Station facts

OwnerTexas Utilities Elec Co
Voltage345 kV
StatusIn Service
Station classtransmission (high confidence)
Likely serving utility nearbyTexas Utilities Elec Co
JurisdictionInside an estimated city ETJ; nearest city Lancaster (0.8 mi)
Coordinates32.5585, -96.7262

Interconnection queue at Watermill Substation

1 generation project name this station as point of interconnection: 1 other. No battery storage projects name it.

From the ERCOT GIS report. Developers, MW and dates are on Pro.

Nearby substations

SubstationVoltageOwnerDistance
Wilmer138 kVTexas Utilities Elec Co2.85 mi
Lancaster138 kVTexas Utilities Elec Co3.74 mi
Southside Tap138 kVTexas Utilities Elec Co3.77 mi
Unnamed station138 kVBrazos Elec Power Coop4.51 mi
Unnamed station138 kVOncor4.93 mi
Hutchins138 kVTexas Utilities Elec Co5.1 mi
Tap310669138 kVTexas Utilities Elec Co5.99 mi

Wholesale prices nearby

The NORTH load zone averaged $39.98/MWh day-ahead over the last 7 days. Nearest generator pricing nodes: ANOL_ESS_RN $31.32, MISAE_GEN_RN $35.55 and MESQUITE_RN $46.52.

See Watermill Substation on the map

Every substation, line, queue project, pipeline and price node in Texas, plus Dub, an AI landman who answers questions about any spot. Free account, no card.

Sources: HIFLD and OpenStreetMap substations and lines, ERCOT GIS report (queue, 2026-09), ERCOT day-ahead prices, TxDOT and StratMap boundaries, Barrio Energy research. Updated 2026-11-09. Screening data only; the serving utility confirms capacity.