Barrio EnergyGrid
Barrio Grid / Texas / Somervell County / Comanche Peak Substation

Comanche Peak Substation, Somervell County, Texas

Comanche Peak Substation is a 345 kV station in Somervell County, Texas, owned by Oncor with 9 transmission lines connected. It is classed as a transmission station: load service would need a new transformer or a distribution sub fed from it. 4 queued projects name it as their point of interconnection.

345 kVhighest voltage
9lines
3generation projects at this POI
1battery projects at this POI
NORTHERCOT load zone
Map of Comanche Peak Substation and nearby substations

Station facts

OwnerOncor
Voltage345 kV
StatusIn Service
Station classtransmission (high confidence)
Likely serving utility nearbyOncor
JurisdictionOutside city limits; nearest city Glen Rose (3 mi)
Coordinates32.2978, -97.7899

Interconnection queue at Comanche Peak Substation

3 generation projects name this station as point of interconnection: 3 solar. 1 battery storage project, 1 with a signed interconnection agreement.

From the ERCOT GIS report. Developers, MW and dates are on Pro.

Nearby substations

SubstationVoltageOwnerDistance
Comanche Peak Station345 kVOncor0.1 mi
Wolf Hollow345 kVWolf Hollow I Power Llc4.26 mi
Wolf Hollow345 kVOncor4.33 mi
Unnamed station69 kVTNMP4.99 mi
Unnamed station138 kVBrazos6.69 mi
Unnamed station138 kVBrazos7.29 mi
Unnamed station138 kVBrazos River Authority7.56 mi

Wholesale prices nearby

The NORTH load zone averaged $39.98/MWh day-ahead over the last 7 days. Nearest generator pricing nodes: MIDP_SLR_RN $39.71, THREEW_S_RN $39.79 and MRKM_SLR_RN $42.56.

See Comanche Peak Substation on the map

Every substation, line, queue project, pipeline and price node in Texas, plus Dub, an AI landman who answers questions about any spot. Free account, no card.

Sources: HIFLD and OpenStreetMap substations and lines, ERCOT GIS report (queue, 2026-09), ERCOT day-ahead prices, TxDOT and StratMap boundaries, Barrio Energy research. Updated 2026-11-09. Screening data only; the serving utility confirms capacity.